Mooring
Port service provided to pick up the ship's mooring
ropes and secure them to the fixed elements meant for this purpose
and indicated by the ship's captain in the mooring area assigned
by the Port Authority. This is done in such a way to enable berthing
and cast off operations, the latter being when the mooring ropes
are let loose following the captain's instructions.
| Type
I. Vessels Berthed on Continuous Dock |
| SHIPSIDE
(G.T.) |
EUROS |
| To 500 |
11,473321 |
| From 501 to 1.000 |
15,055353 |
| From 1.001 to 2.000 |
20,085824 |
| From 2.001 to 4.000 |
23,301239 |
| From 4.001 to 6.000 |
29,040904 |
| From 6.001 to 8.000 |
37,641388 |
| From 8.001 to 10.000 |
43,375043 |
| From 10.001 to 15.000 |
50,196530 |
| From 15.001 to 20.000 |
57,727212 |
| More than 20.000 |
69,194523 |
| Additional capes
|
10
% |
| Type II.- Vessels Berthed on Discontinuous
Docks Moored on Land or Mooring Dolphins |
| SHIPSIDE
(G.T.) |
EUROS |
| To 500 |
18,354909 |
| |
24,100585 |
| From 1.001 to 2.000 |
32,118086 |
| From 2.001 to 4.000 |
37,280780 |
| From 4.001 to 6.000 |
46,464245 |
| From 6.001 to 8.000 |
60,810404 |
| From 8.001 to 10.000 |
69,410887 |
| From 10.001 to 15.000 |
80,313247 |
| From 15.001 to 20.000 |
92,351519 |
| More than 20.000 |
110,730470 |
| ADDITIONAL MOORING ROPES (UNIT)
|
10
% |
The unitary rate covers up to 6 mooring ropes of a ship at berthing
points on a continuous or discontinuous dock.
| Maximum Overcharges |
| Night work (de 20:00 a 08:00 h.) |
100 % |
| Holidays (de 08:00 a 20:00 h.) |
50 % |
| Holidays (de 20:00 a 08:00 h.) |
100 % |
Application rules will be simple and in no case tariffs higher
than 100 percent of the base tariff will be applied.
 |
 |